Line 03

Industrial electrical maintenance

In a plant, the cost of an electrical failure is the production hours lost while it gets repaired. A preventive maintenance contract exists to catch the problem before it stops the line.

What it includes

  • Preventive contracts with a schedule and reports
  • Thermographic inspection of panels and connections
  • Cleaning, torque, and testing of switchgear and breakers
  • Maintenance of generators, ATS, and backup systems
  • Emergency response with a contracted response time
  • Maintenance records for audits and insurers

Why FJ

Scheduled visits

Every visit leaves a report with findings and priorities.

One contract

Electrical, backup, and solar with the same vendor.

Audit history

The records the insurer, the parent company, or the agency asks for.

Frequently asked questions

What does a preventive maintenance contract include?

Scheduled visits based on the criticality of the facility, thermographic inspection, testing and torque of connections, review of generators and ATS, a written report with findings and priorities, and an agreed response time for emergencies.

Do you respond to after-hours emergencies?

For clients with a maintenance contract, yes, with the response time agreed in the contract. For facilities without a contract we evaluate availability case by case.

Send us the scope and we will prepare the proposal.